Linkage Infrastructure, Equipment And Facilities - Grant ID: LE180100101
Funder
Australian Research Council
Funding Amount
$744,697.00
Summary
New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection throug ....New generation facility for impact testing. This project aims to develop a new generation, national-impact testing facility to study the impact response of civil and mechanical structures and components. This project expects to seek simultaneous, realistic impact scenarios with very high velocities, which were previously impossible. This will enhance the capability for innovative research on real-time behaviour of components/systems under high amplitude impacts to augment their protection through advanced materials. This project is essential for research on rational design philosophies and effective retrofitting of high-risk buildings, infrastructure and armoured vehicles. Benefits include the saving of lives and property through new knowledge from credible impact testing.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE140100010
Funder
Australian Research Council
Funding Amount
$900,000.00
Summary
National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique fac ....National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique facility will offer a national and international hub for industry-driven research and consulting. The project outcomes will propel more Australian researchers to be among the world-leaders of rail technologies providing better solutions to challenging track environments. Prototype testing will ensure safer and cost-effective track designs.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100089
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Performance level structural testing facility. A structural testing facility is proposed for the new Advanced Engineering Building at The University of Queensland. The focus of the research supported by this facility will ensure the functionality of Australia’s infrastructure resources and the development of new engineering solutions that will enhance the country’s long-term economic growth.
ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to un ....ARC Centre of Excellence for Geotechnical Science and Engineering. To pioneer new scientific approaches for geotechnical design of Australia's energy and transport infrastructure. Australia will spend over $250 billion during the next five years on the provision of physical infrastructure for energy and transport, which is the critical importance to the nation's future prosperity. The Centre for Geotechnical Science and Engineering will develop new computational and experimental approaches to underpin the geotechnical design of this infrastructure and provide a national focus for geotechnical research. New scientific approaches and software for designing cheaper and safer infrastructure in the energy and transport sectors.Read moreRead less
On-line monitoring of cyanobacteria to predict coagulant doses and powdered activated carbon application in water treatment. Cyanobacteria, more commonly known as blue-green algae, can impact water quality by releasing toxins that can be harmful to human health and imparting unpleasant taste and odours to the water. This project will support the water industry in managing these risks by providing a rapid, on-line tool to assist in their removal during water treatment.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE160100206
Funder
Australian Research Council
Funding Amount
$800,000.00
Summary
National Rock, Concrete and Advanced Composite Testing Capability. National rock, concrete and advanced composite testing capability:
The aim of the project is to develop a national hybrid biaxial/true triaxial load testing facility to serve the needs of geotechnical, structural, mining and materials researchers and engineers for sophisticated testing. It would address the need for leading edge testing and analysis of the deformation and strength of rock, concrete, and thin plates comprising me ....National Rock, Concrete and Advanced Composite Testing Capability. National rock, concrete and advanced composite testing capability:
The aim of the project is to develop a national hybrid biaxial/true triaxial load testing facility to serve the needs of geotechnical, structural, mining and materials researchers and engineers for sophisticated testing. It would address the need for leading edge testing and analysis of the deformation and strength of rock, concrete, and thin plates comprising metals, composites and polymers, under a wide range of loading conditions. The facility would accommodate cubic specimens up to 300 millimetres and be able to apply 10 megapascals of stress in up to three orthogonal directions. State-of-the-art monitoring equipment is designed to assess the degree of damage caused by testing, simulating damage induced by blasting, cutting, static loading and/or impact.Read moreRead less
Barriers for cost - effective rock fall hazard mitigation. Rock fall barriers are used throughout Australia to protect its extensive road and rail networks. These networks are vital links in the nation's infrastructure and underpin its economic prosperity and development. There are thousands of cuttings on Australia' transport networks, many of which have the potential to be affected by rock falls. These events can take lives and severely disrupt the performance of our transport infrastructure. ....Barriers for cost - effective rock fall hazard mitigation. Rock fall barriers are used throughout Australia to protect its extensive road and rail networks. These networks are vital links in the nation's infrastructure and underpin its economic prosperity and development. There are thousands of cuttings on Australia' transport networks, many of which have the potential to be affected by rock falls. These events can take lives and severely disrupt the performance of our transport infrastructure. This project will develop new cost-effective methods for designing against rock fall events using a combination of advanced testing and computer modelling.Read moreRead less
Harnessing the power of oceans: anchors for floating energy devices. This project aims to establish a geotechnical design framework for shared anchoring systems subjected to multidirectional cyclic loading for large integrated arrays of floating wind turbines and floating wave energy converters. This is expected to facilitate new, economic foundation solutions, generating radical cost savings to help unlock Australia's renewable ocean energy resources. The project aims to utilise a blend of stat ....Harnessing the power of oceans: anchors for floating energy devices. This project aims to establish a geotechnical design framework for shared anchoring systems subjected to multidirectional cyclic loading for large integrated arrays of floating wind turbines and floating wave energy converters. This is expected to facilitate new, economic foundation solutions, generating radical cost savings to help unlock Australia's renewable ocean energy resources. The project aims to utilise a blend of state-of-the-art centrifuge modelling techniques and numerical modelling, incorporating an energy-based method and yield envelopes. This innovative methodology aims to establish a validated framework for understanding and predicting foundation performance under the complex load histories arising in renewable ocean energy applications.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE150100130
Funder
Australian Research Council
Funding Amount
$320,000.00
Summary
An earthquake shaking table to investigate soil-structure interactions. An earthquake shaking table to investigate soil-structure interactions: This project aims to develop Australia's most advanced earthquake shaking table. Earthquakes are a problem of great significance to Australia. Infrastructure in civil, transport, mining and energy sectors may be at an unacceptable risk of damage under earthquake loading as current design practices do not account for the interaction between infrastructure ....An earthquake shaking table to investigate soil-structure interactions. An earthquake shaking table to investigate soil-structure interactions: This project aims to develop Australia's most advanced earthquake shaking table. Earthquakes are a problem of great significance to Australia. Infrastructure in civil, transport, mining and energy sectors may be at an unacceptable risk of damage under earthquake loading as current design practices do not account for the interaction between infrastructure and the ground under such loading. The shaking table will simulate earthquakes and enable controlled testing of three-tonne models of foundation and soil-structure interaction systems typical of Australia's infrastructure. The discoveries made are expected to be integral to the modernisation of Australia's seismic design standards so that earthquake-induced damage and risk exposure can be minimised.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE120100011
Funder
Australian Research Council
Funding Amount
$700,000.00
Summary
The national geotechnical centrifuge facility. A new geotechnical centrifuge will enable the modelling of complex offshore and onshore structures. The new facility will support many geotechnical fields, associated with the economical and geographical development of Australia, and ensure that Australia will maintain its leadership within the international physical modelling community.