Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100133
Funder
Australian Research Council
Funding Amount
$400,000.00
Summary
National Facility for Physical Blast Simulation (NFPBS). Recent terrorist attacks employing large quantities of high explosives have prompted the international demand for experimental investigation of civil infrastructure response to shock wave loadings. The National Facility for Physical Blast Simulation (NFPBS) is one of only a few in the world that are suitable for conducting experimental research via a physically generated blast approach.
Stochastic Assessment of Terrorist Blast and Fragmentation Casualty Risks. The project will develop probabilistic models to predict the likelihood and extent of casualties and other losses from terrorist car bombing threats. Car bombs comprise a large quantity of explosives, and produce primary fragments such as wheels, engine block, parts of door panels and other shrapnel that pose a serious safety hazard to people exposed in a street or other mass gatherings. An improved understanding of safet ....Stochastic Assessment of Terrorist Blast and Fragmentation Casualty Risks. The project will develop probabilistic models to predict the likelihood and extent of casualties and other losses from terrorist car bombing threats. Car bombs comprise a large quantity of explosives, and produce primary fragments such as wheels, engine block, parts of door panels and other shrapnel that pose a serious safety hazard to people exposed in a street or other mass gatherings. An improved understanding of safety risks will assist in setting safe evacuation distances. A quantitative assessment of terrorism risks will also allow the effectiveness of security measures to be assessed to provide cost-effective levels of protection that are acceptable to society.Read moreRead less
Infrastructure project delivery: a life cycle evaluation model for public private partnerships. Governments continue to embrace public-private partnerships so as to obtain value for money and provide financial accountability to taxpayers. This project will determine the most appropriate way to engage the private sector in infrastructure delivery and develop a dynamic life cycle evaluation model to ensure projects are delivered effectively and efficiently.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE110100023
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Integrated command and control facility for large-scale critical infrastructure management. This is a test bed facility for achieving sustainable operation of Australia's critical infrastructure, particularly at airports. The facility will enable an integrated and coordinated strategy to increase operational resilience while not losing sight of the complex nature and dynamic requirements of critical infrastructure management.
Fate of engineered nanoparticles: Challenges in informing human and ecological health risk assessments. Engineered nanoparticles (ENPs) have generated significant public and scientific excitement due to their unique properties. This has led to their application in a wide variety of industries (for example, in composite materials and drug delivery). However, there is concern that some ENPs can have detrimental environmental impacts. This project aims to quantify, for the first time, the fate of E ....Fate of engineered nanoparticles: Challenges in informing human and ecological health risk assessments. Engineered nanoparticles (ENPs) have generated significant public and scientific excitement due to their unique properties. This has led to their application in a wide variety of industries (for example, in composite materials and drug delivery). However, there is concern that some ENPs can have detrimental environmental impacts. This project aims to quantify, for the first time, the fate of ENPs that have leached out of commercial products in groundwater systems. This information is expected to assist regulators in developing appropriate legislation to balance the tremendous benefits and potential risks of nanotechnology.Read moreRead less
Optimising Decentralised Membrane Bioreactors for Water Reuse. Water is a critical resource in Australia and as pressures on water resources increase, water recycling has emerged as an important component of water management practises throughout Australia. Decentralised wastewater treatment systems (or package plants) offer opportunities for water recycling in regional communities; however this application is limited by our understanding on the removal of contaminants of concern through these tr ....Optimising Decentralised Membrane Bioreactors for Water Reuse. Water is a critical resource in Australia and as pressures on water resources increase, water recycling has emerged as an important component of water management practises throughout Australia. Decentralised wastewater treatment systems (or package plants) offer opportunities for water recycling in regional communities; however this application is limited by our understanding on the removal of contaminants of concern through these treatment systems. This project will assess the suitability and efficiency of decentralised membrane bioreactors (MBRs) for the removal of endocrine disrupting chemicals (EDCs), pharmaceutically active compounds (PhACs) and pathogens in accordance with the 2006 National Guidelines for Water Recycling.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0883080
Funder
Australian Research Council
Funding Amount
$490,000.00
Summary
Detection of Trace Concentrations of Chemical Contaminants in Urban Water Systems. Water is a critical resource in Australia and as pressures on water resources increase, water recycling is becoming more prevalent. The presence of chemical contaminants such as low concentrations (ng/L) of pharmaceutically active compounds (PhACs), endocrine disrupters (EDCs) and other organic micropollutants in the aquatic environment has received much attention around the world including Australia due to their ....Detection of Trace Concentrations of Chemical Contaminants in Urban Water Systems. Water is a critical resource in Australia and as pressures on water resources increase, water recycling is becoming more prevalent. The presence of chemical contaminants such as low concentrations (ng/L) of pharmaceutically active compounds (PhACs), endocrine disrupters (EDCs) and other organic micropollutants in the aquatic environment has received much attention around the world including Australia due to their potential biological impact in urban water systems. The proposed equipment aims to establish analytical techniques and instrumental capacity for the selective analysis of chemical contaminants in order to improve our understanding of the fate of these compounds through different urban water systems.Read moreRead less
Optimising dissolved air flotation (DAF) for algae removal by bubble modification in drinking water and advanced wastewater systems. Algal blooms in potable water reservoirs and advanced wastewater treatment lagoons can impact the performance and economic viability of water treatment processes resulting in taste and odour episodes and the risk of algal toxins as well as causing further limitation to already stressed water resources in Australia. This project aims to develop an adaptation of the ....Optimising dissolved air flotation (DAF) for algae removal by bubble modification in drinking water and advanced wastewater systems. Algal blooms in potable water reservoirs and advanced wastewater treatment lagoons can impact the performance and economic viability of water treatment processes resulting in taste and odour episodes and the risk of algal toxins as well as causing further limitation to already stressed water resources in Australia. This project aims to develop an adaptation of the dissolved air flotation process that is already used for algae treatment that will provide a more robust, economic and sustainable barrier to algal cells in accordance with the Australian Drinking and Recycled Water Guidelines.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100089
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Performance level structural testing facility. A structural testing facility is proposed for the new Advanced Engineering Building at The University of Queensland. The focus of the research supported by this facility will ensure the functionality of Australia’s infrastructure resources and the development of new engineering solutions that will enhance the country’s long-term economic growth.
Bridge performance assessment through advanced sensing and modelling. Bridge performance assessment through advanced sensing and modelling. This project aims to create cyber infrastructure to manage and maintain civil infrastructure, specifically bridges. Current sensor data interpretation approaches are not good at assessing the performance of civil infrastructure or evaluating the reserve capacity; in particular, they do not adequately account for high levels of systematic modelling uncertaint ....Bridge performance assessment through advanced sensing and modelling. Bridge performance assessment through advanced sensing and modelling. This project aims to create cyber infrastructure to manage and maintain civil infrastructure, specifically bridges. Current sensor data interpretation approaches are not good at assessing the performance of civil infrastructure or evaluating the reserve capacity; in particular, they do not adequately account for high levels of systematic modelling uncertainties. This project intends to ease the current scientific data interpretation bottleneck. Expected outcomes are better infrastructure management and maintenance planning, fewer redundant interventions, modified infrastructure and improved future design.Read moreRead less