Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100028
Funder
Australian Research Council
Funding Amount
$300,000.00
Summary
A national facility for in situ testing of soft soils. A mobile in situ testing laboratory will permit the investigation of devices for measuring geotechnical conditions on soft and swampy sites which are often being encountered on key infrastructure projects. The new facility will improve the modelling and testing of soft soils and ensure the safe and economic development of Australian infrastructure.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE140100010
Funder
Australian Research Council
Funding Amount
$900,000.00
Summary
National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique fac ....National Facility for Cyclic Testing of High-speed Rail (FCTHSR). National facility for cyclic testing of high-speed rail: Frontier technologies in rail transport demand access to state-of-the-art testing facilities for track modelling. The proposed national Facility for Cyclic Testing of High-Speed Rail (FCTHSR) is internationally a first-of-its-kind and it will be designed and built in-house for examining an array of Australian ground conditions and integrated track components. This unique facility will offer a national and international hub for industry-driven research and consulting. The project outcomes will propel more Australian researchers to be among the world-leaders of rail technologies providing better solutions to challenging track environments. Prototype testing will ensure safer and cost-effective track designs.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100089
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Performance level structural testing facility. A structural testing facility is proposed for the new Advanced Engineering Building at The University of Queensland. The focus of the research supported by this facility will ensure the functionality of Australia’s infrastructure resources and the development of new engineering solutions that will enhance the country’s long-term economic growth.
Development of advanced deterioration model for the design of stabilised pavement bases. The Australian road network is a lifeline infrastructure that underpins the nation's living standards and economy. Much of these roads have deteriorated and require rehabilitation to get a new lease of life. This project intends to develop advanced methods to extend the lives of these pavements using in-situ recycling of old pavement materials.
Infrastructure project delivery: a life cycle evaluation model for public private partnerships. Governments continue to embrace public-private partnerships so as to obtain value for money and provide financial accountability to taxpayers. This project will determine the most appropriate way to engage the private sector in infrastructure delivery and develop a dynamic life cycle evaluation model to ensure projects are delivered effectively and efficiently.
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE120100011
Funder
Australian Research Council
Funding Amount
$700,000.00
Summary
The national geotechnical centrifuge facility. A new geotechnical centrifuge will enable the modelling of complex offshore and onshore structures. The new facility will support many geotechnical fields, associated with the economical and geographical development of Australia, and ensure that Australia will maintain its leadership within the international physical modelling community.
Greening procurement of infrastructure construction: optimising mass-haul operations to reduce greenhouse gas emissions. This project will develop and prototype tools to reduce the high environmental impact of mass haul operations in road and rail infrastructure projects. Both contractors and clients need practical methods for calculating, optimising and procuring optimal solutions, because mass haul is one of the few areas where a contractor can reduce carbon dioxide impact.
Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce ....Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce the financial burden placed on taxpayers for cost overruns experienced as well as improve the profitability of organisations. This will lead to greater investment, and contribution to gross domestic product.Read moreRead less