Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and red ....Containment and Reduction of Rework in Transport Mega Projects. Mega transport projects (>$1 billion) are poorly managed during their construction with significant cost and schedule overruns and benefit shortfalls regularly being experienced. Having to perform rework has been identified as a major factor that contributes to these unintended consequences. As there has been limited research that has empirically examined rework causation, an inability to develop effective rework containment and reduction strategies prevails. This research aims to develop a theoretical model that can be used to develop robust containment and reduction strategies to mitigate the adverse economic, productivity and safety consequences that materialize from performing rework during the construction of mega transport projects.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC170100006
Funder
Australian Research Council
Funding Amount
$3,937,625.00
Summary
ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include in ....ARC Training Centre for Advanced Technologies in Rail Track Infrastructure. The ARC Training Centre for Advanced Technologies in Rail Track Infrastructure aims to transform Australia’s rail construction and maintenance technologies through specialist training of industry-focused researchers. Generation of new knowledge and close collaboration with companies within the rail supply chain will result in enhanced rail capacity and supply chain efficiency across the rail network. This will include increased axle loads and higher speeds, greater safety margins, reduced construction and maintenance costs, and a body of competent railway professionals in the nation’s work force.Read moreRead less
Minimisation of damage to residential structures due to ground movement. In Australia some 150,000 new houses are built every year with a total value of approximately $40 billion; making it one of the most significant industries affecting consumers and industries. With a quadrupling of the cost of building new houses in the last 20 years, an increase in the levels of expectations of owners, a high rate of reported damage in new and existing houses, and predications of worsening conditions under ....Minimisation of damage to residential structures due to ground movement. In Australia some 150,000 new houses are built every year with a total value of approximately $40 billion; making it one of the most significant industries affecting consumers and industries. With a quadrupling of the cost of building new houses in the last 20 years, an increase in the levels of expectations of owners, a high rate of reported damage in new and existing houses, and predications of worsening conditions under climate change scenarios; there is an urgent need to evaluate the causes of damage. The outcomes from this project will assist in minimising damage to houses from ground movement and in adopting new performance-based design methods for new homes to better match owner expectations. This will lead to cost effective and innovative solutions to meet adverse conditions.Read moreRead less
Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce ....Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce the financial burden placed on taxpayers for cost overruns experienced as well as improve the profitability of organisations. This will lead to greater investment, and contribution to gross domestic product.Read moreRead less