Controlling arsenic to unlock value in gold and copper resources. This project aims to characterise the transformation of arsenic between oxidation states during mineral processing. Up to one third of the world’s gold reserves are locked up in arsenic rich minerals and 5000 tonnes of arsenic is released annually from mine waste. The project will enable the development of process technology that immobilises and removes arsenic at the earliest possible stage. The use of novel time-resolved in-situ ....Controlling arsenic to unlock value in gold and copper resources. This project aims to characterise the transformation of arsenic between oxidation states during mineral processing. Up to one third of the world’s gold reserves are locked up in arsenic rich minerals and 5000 tonnes of arsenic is released annually from mine waste. The project will enable the development of process technology that immobilises and removes arsenic at the earliest possible stage. The use of novel time-resolved in-situ techniques proposed in this research will give vital information of the complex chemical pathways involved during processing which current characterization methods on pre- and post-processed species do not achieve.Read moreRead less
Mechanisms for Pyrite Oxidation Control in Acid Mine Drainage. The annual costs of acid rock drainage (ARD) management at operating sites in Australia are $120M p.a.; over 15 years, a total cost of $1.8 billion for the whole industry. There are limitations to the ability of existing systems to cope with high capacity ARD, to the long-term effectiveness of these systems and high potential costs/liability of remediation. The value of the project outcomes to industry and government will be in reduc ....Mechanisms for Pyrite Oxidation Control in Acid Mine Drainage. The annual costs of acid rock drainage (ARD) management at operating sites in Australia are $120M p.a.; over 15 years, a total cost of $1.8 billion for the whole industry. There are limitations to the ability of existing systems to cope with high capacity ARD, to the long-term effectiveness of these systems and high potential costs/liability of remediation. The value of the project outcomes to industry and government will be in reduction of ARD release, well-understood long-term outcomes, reduced cost of treatments and improved control. The scale of these savings is in the tens of $M p.a. but also in potential improvements in environment (acid and toxic metals in streams), health and social quality of life in mining areas and towns.Read moreRead less
Evaluation of reaction mechanisms and products in acid rock drainage treatments. There are more than 54 sites in Australia managing major ARD wastes (either >10% of the waste or >10M tonnes) with another 62 sites with less ARD. At operating sites, the annual costs are $60M p.a.; over 15 years, a total cost of $900M for the whole industry. The value of the project outcomes to industry (and government) in reduction of acid and toxic metal release and reduced cost of treatments is potentially in th ....Evaluation of reaction mechanisms and products in acid rock drainage treatments. There are more than 54 sites in Australia managing major ARD wastes (either >10% of the waste or >10M tonnes) with another 62 sites with less ARD. At operating sites, the annual costs are $60M p.a.; over 15 years, a total cost of $900M for the whole industry. The value of the project outcomes to industry (and government) in reduction of acid and toxic metal release and reduced cost of treatments is potentially in the tens of $M p.a.. Improvements in environmental and social quality of life in mining areas and towns will also result from improved treatment.Read moreRead less