A new geomechnical tool for the evaluation of hydrocarbon trap integrity. Hydrocarbon exploration drilling is an intrinsically high risk, high cost activity. Even once a potential reservoir is located there remains the possibility that under recent geological activity the trap has become breached and leaked due to failure of overlying or adjacent rock. This Project will develop a technique that builds on current predictive techniques, and numerical modelling methods, to produce a series of sub-s ....A new geomechnical tool for the evaluation of hydrocarbon trap integrity. Hydrocarbon exploration drilling is an intrinsically high risk, high cost activity. Even once a potential reservoir is located there remains the possibility that under recent geological activity the trap has become breached and leaked due to failure of overlying or adjacent rock. This Project will develop a technique that builds on current predictive techniques, and numerical modelling methods, to produce a series of sub-surface geomechanical models for four important petroleum basins. This new and integrated geomechanical approach will improve current predictive capabilities for detecting breached traps, thus enhancing prospectivity in the major petroleum provinces of Australia.Read moreRead less
Modelling the capillary entrapment phenomena and integrity of geological reservoirs for clean energy, water and waste management technologies. This project will improve our understanding of non-linear flow and fracture phenomena in porous media which is prerequisite for the development of new emerging technologies targeting the reduction of the greenhouse gas emission and development of effective waste and water management solutions including coal gasification, in-situ storage of natural and non ....Modelling the capillary entrapment phenomena and integrity of geological reservoirs for clean energy, water and waste management technologies. This project will improve our understanding of non-linear flow and fracture phenomena in porous media which is prerequisite for the development of new emerging technologies targeting the reduction of the greenhouse gas emission and development of effective waste and water management solutions including coal gasification, in-situ storage of natural and non-hydrocarbon gases, underground disposal of hazardous wastes and vadose zone remediation. The project will result in a dramatic improvement of the predictive tools for traditional ground water management, irrigation and petroleum recovery applications. It has the strength to place Australia in the forefront of these technologies. Read moreRead less
Selective wellbore coatings to control fines damage in coal seam gas wells. This project aims to develop a completely new approach to control solids production in coal seam gas wellbores using a selective phase-inversion polymer coating. The approach will take advantage of the low permeability of mudrocks to form a protective barrier across clay-rich layers while remaining permeable across the gas-producing coal seams. The production of fine solids is a key technical issue affecting the producti ....Selective wellbore coatings to control fines damage in coal seam gas wells. This project aims to develop a completely new approach to control solids production in coal seam gas wellbores using a selective phase-inversion polymer coating. The approach will take advantage of the low permeability of mudrocks to form a protective barrier across clay-rich layers while remaining permeable across the gas-producing coal seams. The production of fine solids is a key technical issue affecting the productivity of coal seam gas wells in Queensland, and leads to 10-15 days’ production downtime a year. The expected outcomes of the project include fundamental understanding of the solids breakage phenomena, a predictive tool to classify potential solids risks in coal seam gas wells, and a novel rock-selective wellbore coating technology to control solids production. The potential economic impacts from the project are lower gas production costs and improved gas supply security.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE150100213
Funder
Australian Research Council
Funding Amount
$180,000.00
Summary
x-ray transparent core flood apparatus . X-ray transparent core flood apparatus: This facility is a novel X-ray transparent flow vessel and ancillaries for achieving direct, near-real-time, 3D measurement and visualisation of material flow inside rock samples. It will enable direct evaluation of how liquid, liquid-solid, gas-liquid and gas-liquid-solid flows behave in cores replicating conditions in underground reservoirs. The coal seam gas, shale gas and oil, and geothermal energy recovery rely ....x-ray transparent core flood apparatus . X-ray transparent core flood apparatus: This facility is a novel X-ray transparent flow vessel and ancillaries for achieving direct, near-real-time, 3D measurement and visualisation of material flow inside rock samples. It will enable direct evaluation of how liquid, liquid-solid, gas-liquid and gas-liquid-solid flows behave in cores replicating conditions in underground reservoirs. The coal seam gas, shale gas and oil, and geothermal energy recovery rely on precise understanding and simulation of subsurface flow. This apparatus will provide a new method to measure and visualise otherwise inaccessible flow behaviour, at a high level of detail, providing characterisation and model validation data underpinning reservoir simulations.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE0452650
Funder
Australian Research Council
Funding Amount
$696,005.00
Summary
South Australian Virtual Reality Centre (SAVRC). It is proposed to install a fully immersive three dimensional visualisation facility in Adelaide, at a cost of $5.3 million including requested ARC contribution of $696,005. Applicant Institutions (Adelaide, Flinders, UniSA and Curtin universities) and Industry will provide the remainder.
The facility will support South Australia's leading scientific researchers in the sciences, engineering, business management, carbon dioxide sequestration, p ....South Australian Virtual Reality Centre (SAVRC). It is proposed to install a fully immersive three dimensional visualisation facility in Adelaide, at a cost of $5.3 million including requested ARC contribution of $696,005. Applicant Institutions (Adelaide, Flinders, UniSA and Curtin universities) and Industry will provide the remainder.
The facility will support South Australia's leading scientific researchers in the sciences, engineering, business management, carbon dioxide sequestration, petroleum exploration and production, space environment, bioinformatics, architecture, surgery, dentistry, archaeology and arts.
The facility will enable researchers and industry to significantly leverage other projects leading to much improved research outcomes and efficiency, potentially worth a hundred million dollars or more.
Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE120100162
Funder
Australian Research Council
Funding Amount
$150,000.00
Summary
Integrated 2MHz Nuclear Magnetic Resonance high temperature tri-axial flow cell apparatus. The development of an integrated facility for petrophysical measurements allows the efficient use of expensive rock cores from gas or liquid reservoirs to develop reliable cross-correlations at conditions encountered in real reservoirs. The equipment is optimised for applications to unconventional reservoirs like Australia’s gas resources, in particular coal-bed methane reservoirs and gas reservoirs where ....Integrated 2MHz Nuclear Magnetic Resonance high temperature tri-axial flow cell apparatus. The development of an integrated facility for petrophysical measurements allows the efficient use of expensive rock cores from gas or liquid reservoirs to develop reliable cross-correlations at conditions encountered in real reservoirs. The equipment is optimised for applications to unconventional reservoirs like Australia’s gas resources, in particular coal-bed methane reservoirs and gas reservoirs where gas is difficult to extract.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC150100019
Funder
Australian Research Council
Funding Amount
$4,571,797.00
Summary
ARC Training Centre for Liquefied Natural Gas Futures. ARC Training Centre for Liquefied Natural Gas Futures. This training centre aims to deliver projects and training to enable future Australian Liquefied Natural Gas (LNG) production from reserves in deep water, at small or remote on-shore locations, with greater efficiency, less environmental impact, and at lower cost than currently possible. This should be accomplished via research projects undertaken by the PhD students and research fellows ....ARC Training Centre for Liquefied Natural Gas Futures. ARC Training Centre for Liquefied Natural Gas Futures. This training centre aims to deliver projects and training to enable future Australian Liquefied Natural Gas (LNG) production from reserves in deep water, at small or remote on-shore locations, with greater efficiency, less environmental impact, and at lower cost than currently possible. This should be accomplished via research projects undertaken by the PhD students and research fellows with guidance from the centre’s industrial partners. The centre’s expected legacy is a unique research and training facility, designed for future integration into a microscale LNG plant. The anticipated research and training outcomes will help to ensure Australia plays a leading role in future global LNG developments.Read moreRead less
Advanced environmental technologies for increasing coal seam permeability. This project aims to understand the physical/chemical mechanisms occurring when benign chemicals interact and dissolve minerals and coal surfaces in the natural fractures during the extraction of coal seam gas. Technologies for increasing the permeability of coal have become necessary for commercially viable coal seam gas (CSG) extraction in Australia. Currently available methods from the conventional gas industry, are pr ....Advanced environmental technologies for increasing coal seam permeability. This project aims to understand the physical/chemical mechanisms occurring when benign chemicals interact and dissolve minerals and coal surfaces in the natural fractures during the extraction of coal seam gas. Technologies for increasing the permeability of coal have become necessary for commercially viable coal seam gas (CSG) extraction in Australia. Currently available methods from the conventional gas industry, are problematic for coal, and fail to capitalise on coal’s existing fracture network. The intended project outcome is a range of new coal-specific technologies for enhancing permeability that avoid unwanted and irreversible damage to seams and protect the environment. Combined with reduced costs, these methods would benefit sustainable growth of Australia’s CSG industry.Read moreRead less
Multiscale physics theory to understand secondary migration of hydrocarbons. This project aims to derive mathematical models to reveal the geological history of how petroleum accumulates at laboratory, reservoir, and basin scales. The project will identify secondary migration trajectories of hydrocarbons from source rocks to stratigraphic traps, to optimise exploration for energy resources. By enabling multiscale analytical modelling, the new model will improve the reliability of reservoir chara ....Multiscale physics theory to understand secondary migration of hydrocarbons. This project aims to derive mathematical models to reveal the geological history of how petroleum accumulates at laboratory, reservoir, and basin scales. The project will identify secondary migration trajectories of hydrocarbons from source rocks to stratigraphic traps, to optimise exploration for energy resources. By enabling multiscale analytical modelling, the new model will improve the reliability of reservoir characterisation at the crucial initial exploitation stage, and prediction of oil-gas distribution in petroleum basin. The novel multiscale approach is expected to significantly improve exploration and exploitation and create highly skilled jobs to incorporate such modelling into the energy sector.Read moreRead less