Linkage Infrastructure, Equipment And Facilities - Grant ID: LE130100089
Funder
Australian Research Council
Funding Amount
$500,000.00
Summary
Performance level structural testing facility. A structural testing facility is proposed for the new Advanced Engineering Building at The University of Queensland. The focus of the research supported by this facility will ensure the functionality of Australia’s infrastructure resources and the development of new engineering solutions that will enhance the country’s long-term economic growth.
Sewer Monitoring and Management in the Digital Era. Overflow, flooding, corrosion, and odorous emissions are persistent issues for utilities managing sewers. Current sewer maintenance is reactive, and focuses on solving problems in local networks, despite that optimal solutions require a system-wide approach. Capitalising on recent development in IoT sensors, wireless transmission, and machine learning, this multidisciplinary project aims to develop digital-twin supported data analytics for proa ....Sewer Monitoring and Management in the Digital Era. Overflow, flooding, corrosion, and odorous emissions are persistent issues for utilities managing sewers. Current sewer maintenance is reactive, and focuses on solving problems in local networks, despite that optimal solutions require a system-wide approach. Capitalising on recent development in IoT sensors, wireless transmission, and machine learning, this multidisciplinary project aims to develop digital-twin supported data analytics for proactive sewer management including network-wide real-time control. The project aims to generate significant social, environmental and economic benefits by enabling utilities to better protect public and environmental health, reduce sewer odour and greenhouse gas emissions, and extend sewer asset life.Read moreRead less
Network-wide sewer odour and corrosion management by model predictive control. Network-wide sewer odour and corrosion management by model predictive control. This project aims to develop and demonstrate, through real-life field studies, a model predictive control approach that achieves cost-effective network-wide mitigation of hydrogen sulphide. The lack of suitable methodologies to support the control designs of chemical dosing units and sewage pumping stations makes network-wide sewer corrosio ....Network-wide sewer odour and corrosion management by model predictive control. Network-wide sewer odour and corrosion management by model predictive control. This project aims to develop and demonstrate, through real-life field studies, a model predictive control approach that achieves cost-effective network-wide mitigation of hydrogen sulphide. The lack of suitable methodologies to support the control designs of chemical dosing units and sewage pumping stations makes network-wide sewer corrosion and odour management a problem. Innovative control methodology will simultaneously manipulate chemical dosing unit(s) and selected sewage pumping station(s), based on real-time prediction of sewage flows and characteristics both at sources and across the network, to ensure optimal delivery of dosed chemicals to mitigate hydrogen sulphide.Read moreRead less
Industrial Transformation Training Centres - Grant ID: IC230100015
Funder
Australian Research Council
Funding Amount
$5,000,000.00
Summary
ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation ....ARC Training Centre for Whole Life Design of Carbon Neutral Infrastructure. This Centre aims to transform the capability of civil infrastructure stakeholders to design, construct, operate and dispose of infrastructure in a carbon neutral way. By training industry-embedded PhDs and postdocs in the methodology and technology required to design out excess carbon of infrastructure in its whole life, this Centre expects to lead the world in sustainable infrastructure design, enabling a new generation of infrastructure design in Australia and internationally. Achieving carbon neutral infrastructure in its whole life will bring significant far-reaching benefits, including equipping industry with tools required to meet Australia’s emission reduction targets as well as economic, commercial, environmental, and social gains.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE120100011
Funder
Australian Research Council
Funding Amount
$700,000.00
Summary
The national geotechnical centrifuge facility. A new geotechnical centrifuge will enable the modelling of complex offshore and onshore structures. The new facility will support many geotechnical fields, associated with the economical and geographical development of Australia, and ensure that Australia will maintain its leadership within the international physical modelling community.
Novel test and design methods for base course reinforced flexible pavements. This project aims to develop the mechanics of geosynthetic-reinforced flexible pavements as an urgent need for the Australian pavement industry to build more sustainable and economical roads. Novel laboratory test apparatus and in-situ test programs, and mathematical models will be developed, for the first time, to capture the responses of reinforced base courses in a complete and optimised way to determine the paramete ....Novel test and design methods for base course reinforced flexible pavements. This project aims to develop the mechanics of geosynthetic-reinforced flexible pavements as an urgent need for the Australian pavement industry to build more sustainable and economical roads. Novel laboratory test apparatus and in-situ test programs, and mathematical models will be developed, for the first time, to capture the responses of reinforced base courses in a complete and optimised way to determine the parameters for pavement design and performance evaluation. The outcomes will enable reliable prediction of reinforced pavement behaviour, leading to better-performing geosynthetic products and more resilient pavements, reduced material usage and damage in pavements, and less environmental impact and maintenance cost.Read moreRead less
Mesozoic Austral Biodiversity: Research and Regional Museum Applications. The impact of environmental alteration on Australia’s biodiversity has poorly understood long-term effects. This project examines the controversial biogeography and evolution of Australia’s biodiversity during the Age of Dinosaurs (mid-Cretaceous ~100 MYA) and their adaptational responses to climatic change. Fossils readily capture the public imagination and thus help promote complex scientific concepts in the global media ....Mesozoic Austral Biodiversity: Research and Regional Museum Applications. The impact of environmental alteration on Australia’s biodiversity has poorly understood long-term effects. This project examines the controversial biogeography and evolution of Australia’s biodiversity during the Age of Dinosaurs (mid-Cretaceous ~100 MYA) and their adaptational responses to climatic change. Fossils readily capture the public imagination and thus help promote complex scientific concepts in the global media. This project raises awareness about sustainable use of non-renewable fossil resources through public education and ecotourism fieldwork programs; these will help generate local interest and thus protection of sensitive fossil localities by highlighting them as lucrative tourism assets for regional communities.Read moreRead less
Examining the effectiveness of co-creation practices on health outcomes. This projects aims to examine how patients interact collaboratively with multiple stakeholders in a health system (co-creation). Governments and health-care providers continually seek new ways to be more efficient and to create more effective health service outcomes. This research aims to identify why co-creation will be important in the formulation of future health policy. The project plans to assess patient-centred practi ....Examining the effectiveness of co-creation practices on health outcomes. This projects aims to examine how patients interact collaboratively with multiple stakeholders in a health system (co-creation). Governments and health-care providers continually seek new ways to be more efficient and to create more effective health service outcomes. This research aims to identify why co-creation will be important in the formulation of future health policy. The project plans to assess patient-centred practices using qualitative and quantitative health outcome measures and to model the patient’s end-to-end journey by developing new metrics. The intended outcomes are practical guidelines to help health professionals focus on the most effective co-creation activities and interactions. The research aims to determine how co-creation practices shape a service ecosystem by examining the effectiveness of a patient-centred approach on health care service outcomes. Findings will improve the implementation of health care practices.Read moreRead less
Managing and mitigating social risks of major infrastructure projects. This project aims to reduce social risks of major infrastructure projects by generating an evidence-based social risk management framework. It brings together leading ANU researchers with top organisations in Australia's infrastructure sector, already working together via the ANU Institute for Infrastructure in Society. The project seeks to improve social risk management in a multi-billion dollar sector, vital to all Australi ....Managing and mitigating social risks of major infrastructure projects. This project aims to reduce social risks of major infrastructure projects by generating an evidence-based social risk management framework. It brings together leading ANU researchers with top organisations in Australia's infrastructure sector, already working together via the ANU Institute for Infrastructure in Society. The project seeks to improve social risk management in a multi-billion dollar sector, vital to all Australians. The project is significant because it adopts a sector-wide view to systematically define social risk, co-create a social risk management framework and implement it via a new social risk management toolkit. This should lessen harm to communities, reduce delays and costs and benefit national infrastructure delivery.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE210100035
Funder
Australian Research Council
Funding Amount
$1,205,137.00
Summary
Founding an Australian Critical Zone Observatory Network. This proposal founds a new network of Australian Critical Zone Observatories. The network will fill essential knowledge gaps about interactions of under- and above-ground environmental processes and their responses to disturbance and change. These interactions determine the sustainability of food, clean water, mineral resources and Australian ecosystems, and cannot be studied with existing environmental infrastructure. The 5 foundation ....Founding an Australian Critical Zone Observatory Network. This proposal founds a new network of Australian Critical Zone Observatories. The network will fill essential knowledge gaps about interactions of under- and above-ground environmental processes and their responses to disturbance and change. These interactions determine the sustainability of food, clean water, mineral resources and Australian ecosystems, and cannot be studied with existing environmental infrastructure. The 5 foundational sites will host integrated monitoring equipment to observe stocks and fluxes of carbon, water, energy and mass across the “Critical Zone” – the vertical span from plant canopies to fresh bedrock. Joining a burgeoning international movement, the network will catalyse Critical Zone science in Australia.Read moreRead less