Efficient construction: analysis of integrated supply chains for innovative off site housing manufacturing. The Australian housing industry is failing to meet demand. Housing construction is too slow, as indicated by a 40 per cent increase in average construction time over the last fifteen years. Industry fragmentation is an oft-cited cause of construction inefficiency. A solution is offsite manufacturing. Australia lags other countries in adoption of off-site manufacturing. To achieve adoption ....Efficient construction: analysis of integrated supply chains for innovative off site housing manufacturing. The Australian housing industry is failing to meet demand. Housing construction is too slow, as indicated by a 40 per cent increase in average construction time over the last fifteen years. Industry fragmentation is an oft-cited cause of construction inefficiency. A solution is offsite manufacturing. Australia lags other countries in adoption of off-site manufacturing. To achieve adoption and diffusion, fragmentation needs to be addressed. This project aims to analyse the factors affecting supply chain integration to support innovative offsite manufacturing and develop a novel collaborative practice based implementation model.Read moreRead less
Special Research Initiatives - Grant ID: SR180100036
Funder
Australian Research Council
Funding Amount
$650,054.00
Summary
Remediation of PFAS in current and legacy biosolids application sites. This project aims to develop novel immobilisation, adsorption and/or thermal destruction methods for biosolids, soil and groundwater in current and legacy per- and poly-fluroalkyl substance (PFAS) sites receiving biosolids. Biosolids generated during waste water treatment carry an unknown potential risk of soil and groundwater PFAS contamination, through their application in agriculture and rehabilitation sites. This project ....Remediation of PFAS in current and legacy biosolids application sites. This project aims to develop novel immobilisation, adsorption and/or thermal destruction methods for biosolids, soil and groundwater in current and legacy per- and poly-fluroalkyl substance (PFAS) sites receiving biosolids. Biosolids generated during waste water treatment carry an unknown potential risk of soil and groundwater PFAS contamination, through their application in agriculture and rehabilitation sites. This project will provide the first major investigation of the release, fate and remediation of perfluorinated compounds in relation to their environmental pathways through wastewater treatment plants in Australia. The data will be evaluated to determine if perfluorinated compounds should be further incorporated into Australian soil and water quality monitoring programs. The project will provide evidence of research advice and methodologies being successfully adopted by water industry end-users, government regulatory agencies and private remediation industries.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE240100116
Funder
Australian Research Council
Funding Amount
$1,200,000.00
Summary
Facilities for Atmospheric Boundary Layer Evaluation and Testing. This proposal aims to establish state-of-the-art stationary and mobile facilities for atmospheric wind, dust and plume measurements with unique capability to quantify the effect of climate change, surface topography and urbanisation on near-surface microclimate where humans live. To better predict microclimate, mitigate air pollution impacts and exploit local conditions for improved urban planning and agricultural yield, high qual ....Facilities for Atmospheric Boundary Layer Evaluation and Testing. This proposal aims to establish state-of-the-art stationary and mobile facilities for atmospheric wind, dust and plume measurements with unique capability to quantify the effect of climate change, surface topography and urbanisation on near-surface microclimate where humans live. To better predict microclimate, mitigate air pollution impacts and exploit local conditions for improved urban planning and agricultural yield, high quality observations of the near-surface atmosphere at fine temporal and spatial resolutions are required. The proposed Facilities for Atmospheric Boundary Layer Evaluation and Testing (FABLET) will advance Australia’s capability to make these difficult measurements of atmospheric boundary layer.Read moreRead less
Early Career Industry Fellowships - Grant ID: IE230100437
Funder
Australian Research Council
Funding Amount
$417,237.00
Summary
Nanobubbles for effective and energy efficient water treatment. This project aims to produce new knowledge for developing ozone nanobubbles as a technological option for the water industry where commercially suitable technologies are unavailable. Australian water utilities have identified two key challenges: destruction of micropollutants and natural organic matter in recycled and reservoir water, respectively. New knowledge from the project will allow these water utilities to utilise the extrao ....Nanobubbles for effective and energy efficient water treatment. This project aims to produce new knowledge for developing ozone nanobubbles as a technological option for the water industry where commercially suitable technologies are unavailable. Australian water utilities have identified two key challenges: destruction of micropollutants and natural organic matter in recycled and reservoir water, respectively. New knowledge from the project will allow these water utilities to utilise the extraordinary properties of nanobubbles and the strong oxidation capability of ozone for effective and energy efficient water treatment. Tech-transfer to the industry is guaranteed through a scientifically designed pilot plant for benchmarking against the current state of the art ozonation process and reverse osmosis.Read moreRead less
Sustainable Hydrogen Production from Used Water. The project aims to address the pressing challenge of water scarcity in hydrogen production by developing an innovative approach of using used water as the feed for water electrolysis. The project will result in an in-depth understanding of the impacts of water impurities in used water on the performance and durability of water electrolysers, and develop guidelines for the design of highly durable water electrolysers and the operation and upgrade ....Sustainable Hydrogen Production from Used Water. The project aims to address the pressing challenge of water scarcity in hydrogen production by developing an innovative approach of using used water as the feed for water electrolysis. The project will result in an in-depth understanding of the impacts of water impurities in used water on the performance and durability of water electrolysers, and develop guidelines for the design of highly durable water electrolysers and the operation and upgrade of existing wastewater treatment plants. The project will advance the practical applications of water electrolysis for scalable and sustainable hydrogen production and help Australia secure a leading position in the global emerging hydrogen economy.Read moreRead less
A multi-agent system for stakeholder management in off-site construction. This project aims to investigate a socio-technology model for stakeholders and informatics to improve off-site construction (OSC) productivity in infrastructure construction. A multi-agent system for OSC could drive down cost, but requires highly integrated collaboration among stakeholders. The project’s quantitative approaches include large-scale social network analysis, multi-agent consensus modelling and an optimisation ....A multi-agent system for stakeholder management in off-site construction. This project aims to investigate a socio-technology model for stakeholders and informatics to improve off-site construction (OSC) productivity in infrastructure construction. A multi-agent system for OSC could drive down cost, but requires highly integrated collaboration among stakeholders. The project’s quantitative approaches include large-scale social network analysis, multi-agent consensus modelling and an optimisation algorithm for collaborative planning. The project outcomes are expected to secure long-term economic benefits by enhancing performance in complex projects.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE200100168
Funder
Australian Research Council
Funding Amount
$550,000.00
Summary
Integrated Functional Printing Facility for Advanced Material Technologies. The project aims to develop Australia’s first fully integrated small-scale and agile prototyping facility for printing. This facility will provide critical infrastructure to deposit a wide range of advanced materials with unprecedented precision & process flexibility allowing realistic form, configuration and device-ready formats with minimal usage of functional ink. Using this unique facility, researchers will be able t ....Integrated Functional Printing Facility for Advanced Material Technologies. The project aims to develop Australia’s first fully integrated small-scale and agile prototyping facility for printing. This facility will provide critical infrastructure to deposit a wide range of advanced materials with unprecedented precision & process flexibility allowing realistic form, configuration and device-ready formats with minimal usage of functional ink. Using this unique facility, researchers will be able to assess integration of novel functional materials in a wide range of devices and applications, including critical components of affordable healthcare diagnostic devices, advanced security features in banknotes, integrated RFID tracking systems, high performance solar cells and separation membranes. Read moreRead less
Improving water quality modelling by better understanding solute transport. Poor stream water quality is a critical problem in Australia and globally. Stream water quality depends directly on pathways and time taken for water to transport pollutants through catchments. Predicting these pathways is highly challenging and currently requires specialised data. This project aims to better model the movement of water from rainfall to streams, enable greatly improved use of water quality data routinely ....Improving water quality modelling by better understanding solute transport. Poor stream water quality is a critical problem in Australia and globally. Stream water quality depends directly on pathways and time taken for water to transport pollutants through catchments. Predicting these pathways is highly challenging and currently requires specialised data. This project aims to better model the movement of water from rainfall to streams, enable greatly improved use of water quality data routinely collected in Australia's catchments and thereby better predict water quality behaviour. Proposed field studies aim to support this development. The outcomes sought are improved planning and management of water quality in our rivers, lakes and estuaries, improved health of these water bodies and improved water supplies.Read moreRead less