Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce ....Design and Construction Error Mitigation in Infrastructure Projects. Human errors committed during the design and construction process of infrastructure projects increase costs by as much as 25 per cent. The costs associated with such errors would be significantly higher in the event of an engineering failure and loss of life. This research will develop a model that can be used to mitigate errors and improve the performance and safety of infrastructure projects. A reduction in errors will reduce the financial burden placed on taxpayers for cost overruns experienced as well as improve the profitability of organisations. This will lead to greater investment, and contribution to gross domestic product.Read moreRead less
Linkage Infrastructure, Equipment And Facilities - Grant ID: LE110100052
Funder
Australian Research Council
Funding Amount
$870,000.00
Summary
Hybrid testing facility for structures under extreme loads. This unique testing facility will provide a regional and national focus for large three dimensional static and dynamic testing of components, systems and infrastructure used in civil engineering, mining and railways as well as in the aerospace and automotive industries.